Carriage House(Click on thumbs for larger view) |
| Side and front views of the old shed before demolition. |
 |
 |
| Excavation begins: preparing the site for the concrete foundation. |
 |
| After the concrete sets, framing begins. |
 |
 |
| The installation of a cupola will aid in the illumination of the Carriage House. |
 |
 |
| The structure is finished with a coat of stain to match the house. |
 |
 |